Key Points
LRT train derailed May 29 near Chan Sow Lin Station due to track switch fault.
Six coaches successfully rerailed by May 31 and returned to depot for inspection.
Service expected to resume by June 5 with modified schedules during recovery.
APAD investigation covers maintenance procedures, safety systems, and operations standards.
A train on Malaysia’s Ampang/Sri Petaling Line derailed near Chan Sow Lin Station on May 29 after a fault in a track switch. Rapid KL successfully rerailed six coaches by May 31 and returned them to the depot for inspection. Transport Minister Anthony Loke said the affected track would resume operations by June 5. The incident has triggered calls for transparency on maintenance budgets and safety protocols.
Recovery Efforts Move Quickly
Four derailed train cars were successfully rerailed and returned to the depot on May 30. Two additional coaches were lifted back onto the tracks on May 31. Rapid KL used specialized track vehicles to safely remove the coaches from the site. Power cables and key track components are undergoing repair as the technical team conducts thorough inspections before moving remaining coaches to the depot.
Service Disruptions Continue
All stations along the Ampang/Sri Petaling Line remained open, but services ran on a modified schedule during the recovery period. Transport Minister Datuk Seri Anthony Loke stated the affected track would resume normal operations no later than Wednesday, June 5. Rapid KL asked passengers for patience as repair work progressed.
Maintenance and Safety Questions Emerge
The Land Public Transport Agency (APAD) launched an official investigation covering standard operating procedures, asset maintenance, safety systems, and train operations. Opposition figures have called for the government to disclose annual maintenance budgets and actual spending. The incident follows a series of service disruptions and technical faults on the rail network in recent years, raising concerns about whether maintenance allocations are sufficient and funds are being used effectively.
Broader Reliability Concerns
Public transport experts note that the derailment exposes potential systemic issues beyond a single technical failure. Four derailed train cars were successfully returned to the depot for inspection. Two more coaches were rerailed as repairs continued. Authorities must explain whether current safety management practices are adequate for a rail system that has operated for many years.
Final Thoughts
The LRT derailment revealed a track switch fault that Rapid KL corrected within two days. The incident raises valid questions about maintenance budgets and safety oversight that the government should address transparently to restore public confidence in the rail system.
FAQs
A track switch fault caused the Ampang/Sri Petaling Line train to derail on May 29. The exact failure nature remains under investigation by APAD.
The affected track will resume operations by Wednesday, June 5, per Transport Minister Anthony Loke. Modified schedules operated during recovery efforts.
Six coaches derailed. Four were rerailed May 30 and returned to depot; two additional coaches were rerailed May 31.
Disclaimer:
The content shared by Meyka AI PTY LTD is solely for research and informational purposes. Meyka is not a financial advisory service, and the information provided should not be considered investment or trading advice.
About Author

Danny Kontos
Co FounderDanny Kontos has been a stock investor since 2007 and co-founded Meyka in 2023. He keeps a small, focused portfolio and only moves when the numbers are hard to argue with. He has waited years on a single position before. Before Meyka, he ran a web hosting company and a mortgage lending platform, so he knows what a well-run business actually looks like under the hood. This article did not come from a news cycle. It came from someone who has been watching this space for a long time.
What brings you to Meyka?
Pick what interests you most and we will get you started.
I'm here to read news
Find more articles like this one
I'm here to research stocks
Ask Meyka Analyst about any stock
I'm here to track my Portfolio
Get daily updates and alerts (coming March 2026)