Key Points
B62 closes June 19 midnight to June 21 4 p.m. for A7 bridge work.
Traffic diverts via A5, A7, and local detour routes U1, U73, U84.
Vehicles under 30 tons have alternative routes; trucks follow specific detours.
Autobahn GmbH posts signs on A5 and A7 for driver guidance.
The B62 federal road at Niederaula will shut down completely from Friday, June 19, at midnight through Sunday, June 21, at 4 p.m. for bridge construction work on the A7 motorway. The closure requires a support structure for building a new underpass. Traffic must use alternate routes through the A5, A7, and local roads.
Closure Details and Timeline
The B62 will be completely blocked under the A7 bridge from June 19 at midnight to June 21 at 4 p.m. This 64-hour closure allows construction crews to build a support frame for the new western section of the B62 plus DB underpass. The Autobahn GmbH says the work is essential for safety during bridge construction on three A7 spans near Niederaula.
Detour Routes for Drivers
Traffic from Alsfeld to Niederaula can use the A5, Hattenbacher junction, and A7. Drivers from Niederjossa must take detour U84 via Unter-Schwarz and Fraurombach to the Hünfeld/Schlitz exit, then continue on the A7. Vehicles under 30 tons can also use detour U1 through Unter-Schwarz, Solms, and Mengshausen. Access to Rosi’s Autohof and McDonald’s remains open from the Niederaula exit.
Signage and Traffic Management
The Autobahn GmbH will post detour signs on the A5 and A7. Traffic information services will track congestion during the closure. Authorities ask drivers to use caution on alternate routes and expect increased traffic on local roads. The closure affects both trucks and passenger cars equally.
Construction Context
The closure is part of ongoing work on three A7 bridges at Niederaula. The new underpass structure will connect the B62 with railway infrastructure. This is one of several closures planned for the region as bridge renovation continues through 2026.
Final Thoughts
The B62 closure June 19-21 will redirect traffic through the A5, A7, and local detours. Plan extra travel time and use alternate routes to avoid the 64-hour shutdown.
FAQs
Friday, June 19 at midnight through Sunday, June 21 at 4 p.m. The complete closure lasts 64 hours for bridge support construction.
Yes. Use the A5 via Hattenbacher junction and A7, or take detour routes U1, U73, or U84 depending on your direction and vehicle type.
Yes. Rosi’s Autohof Niederaula and McDonald’s remain open and accessible via the Niederaula exit on the A7 throughout the closure.
Disclaimer:
The content shared by Meyka AI PTY LTD is solely for research and informational purposes. Meyka is not a financial advisory service, and the information provided should not be considered investment or trading advice.
About Author

Danny Kontos
Co FounderDanny Kontos has been a stock investor since 2007 and co-founded Meyka in 2023. He keeps a small, focused portfolio and only moves when the numbers are hard to argue with. He has waited years on a single position before. Before Meyka, he ran a web hosting company and a mortgage lending platform, so he knows what a well-run business actually looks like under the hood. This article did not come from a news cycle. It came from someone who has been watching this space for a long time.
What brings you to Meyka?
Pick what interests you most and we will get you started.
I'm here to read news
Find more articles like this one
I'm here to research stocks
Ask Meyka Analyst about any stock
I'm here to track my Portfolio
Get daily updates and alerts (coming March 2026)